Span lengths: |
|
|
River bridge: |
3 × 108.50 m |
|
|
Flood plain bridges: |
3 × 73.50 m (two bridges) |
|
|
Main bridge over streambed: |
|
|
|
Symmetrical viaducts of: |
|
|
|
Total length: |
|
|
|
Roadway widths: |
4 × 17.50/4 m |
|
|
Designer: |
UVATERV (Engineering Consultants for Transport and Communication),
Dr. Tibor Sigray (chief engineer) |
|
|
Main contractor: |
Bridge Construction Company |
|
|
Construction costs: |
883.954 million Ft |
|
|
Owner of the bridge: |
Motorway Directorate |
|