Span lengths: |
|
|
Main bridge over streambed: |
15*(60.4+60.9+60.4)+2*68.5+ 140.0+190.0+140.0+68.5 = 1593.0
m |
|
|
Roadway widths: |
8.5 m for two lanes |
|
|
Designer: |
Railway Study and Design Institute ISPCF,
Bucharest Dr. Dragos Teodorescu (Chief. Eng.) |
|
|
Main contractor: |
Railway and Road Construction Company, Bucharest
Bridge Construction Company, Bucharest |
|
|
Owner of the bridge: |
|
|